Loading Test

This week we performed a Loading Test of a lifting beam of 255 tons. The test was carried out by means of 2 pressure control units and 6 hydraulic jacks and a fastening system.

Loading test

May 2018

This test is done to certify the lifting beam according to the directive 2006/42/EC and to use it at the loading in the Port of Gijón of the modules we have manufactured in our facilities and at their unloading in destination (Texas).